Roof Armor, Roof Rejuvenation Systems

How Roof Rejuvenation Works, Step by Step

A typical house takes one afternoon. The owner checks the roof, we fix the small problems, then we spray the treatment. On a warm, dry day the roof is ready to walk on in about an hour.

Illustration: fine spray mist settling onto asphalt shingle granulesIllustration

The five steps

Every job follows the same order, start to finish.

  1. 01
    Free assessment

    The owner gets up on the roof himself. He checks the shingles, how much granule loss there is, how well they bend, and the flashing. Then he tells you if treatment fits or if you really need a new roof.

  2. 02
    Pick a dry day

    The treatment needs mild, dry weather to soak in. We set the date around the forecast, not the other way around.

  3. 03
    Tune-up

    Loose shingles get fastened down, flashings get fresh sealant, and popped nails get fixed. Spraying over a problem doesn't solve it, so this comes first.

  4. 04
    Clear and spray

    Leaves, pine needles and loose debris come off so the shingles are clean and dry. Then we mix APEX-1132, 5 parts water to 1 part concentrate, and spray it on in even passes.

  5. 05
    Dry time

    The shingles soak it in over the next hour or two. Each treatment comes with a 5-year transferable warranty, and we give you the written terms before work starts.

What you'll see on treatment day

There will be a ladder against the house and someone on your roof with a spray wand. That's most of it. No dumpster, no tear-off, no pile of old shingles in the yard.

The treatment comes out as a milky white liquid. It doesn't stay white. It starts soaking into the shingle right away, and the white fades as it dries in. Treated shingles often look a little darker, especially on a sun-faded roof. There's little to no smell.

A few things help the day go smoothly:

  • Keep pets inside and kids out of the work area until the roof is dry
  • Move cars that are parked right under the roof edge
  • Tell us about any delicate plants close to the house

The maker's guide says to protect windows, cars and delicate plants, and to rinse any overspray off with water. That's how we work.

Cure times, in plain terms

These times come from the product data sheet, measured at 70 to 80°F and 50% humidity. Cooler or damper days take longer.

ItemTimeWhat it means
Tack freeAbout 30 minutesThe surface is no longer wet or sticky to the touch
Foot trafficAbout 1 hourSafe to walk on, so we can finish up and check our work
Full cureAbout 1 to 2 hoursThe treatment has finished drying into the shingles

Weather limits

The treatment is mixed with water, and it freezes at 32°F. So we only spray in mild, dry weather. A wet roof won't take it in well, and fresh treatment needs time to soak in before any rain shows up.

That matters here. Piedmont summers bring pop-up thunderstorms, and some winters bring ice storms. In practice, it means:

  • No spraying on a wet roof
  • No spraying when rain is likely before the treatment dries
  • No spraying when it's freezing or close to it

If the forecast turns, we move the date. A day's wait costs you nothing. Spraying into a storm could cost you the treatment. More on that in can you rejuvenate a roof if rain is coming.

A Roof Armor treatment being applied to an asphalt shingle roof
A Roof Armor treatment of APEX-1132 going on.
What the spray won't fix

Treatment helps sound shingles stay flexible. It won't stop an active leak, replace missing shingles, firm up soft decking or kill algae. If your roof has those problems, you'll hear about it at the assessment, before any work is booked.

After we leave

Once the roof is dry, you don't have to do anything special to it. Life goes back to normal.

In about 5 years the shingles will have aged some more. That's when a second treatment makes sense. Each round can add up to about 5 years, and repeat treatments can stretch a roof up to about 15 extra years in total. Each new treatment comes with its own 5-year transferable warranty.

Curious what the tune-up part covers? Read about our roof tune-up, including flashing resealing and nail pop repair. Want to know more about what's in the sprayer? That's on the soy roof treatment page.

What happens inside the shingle

Dry shingle Cross-section of an asphalt shingleLayers from top: mineral granules, asphalt, fiberglass mat, asphalt, then the roof deck. A dry shingle has cracked asphalt and loose granules. After treatment the asphalt is restored and the granules are held in place. HEAT + UV 01GRANULES02ASPHALT03FIBERGLASS MAT04ASPHALT05ROOF DECK

Simplified cross-section, not to scale

  1. 01 Granules
  2. 02 Asphalt
  3. 03 Fiberglass mat
  4. 04 Asphalt
  5. 05 Roof deck

Common questions

How long does roof rejuvenation take?

Most homes take one afternoon, counting the tune-up and the spray. Bigger or steeper roofs take longer. On a warm day the surface is dry to the touch in about 30 minutes, and it can be walked on after about an hour. The free assessment comes first, before we book the treatment day.

Does roof rejuvenation smell?

Very little. The product data sheet lists it as no or minimal odor, and it's made from soybean oil. If you're sensitive to smells, keep the windows closed on the side of the house we're working on until the roof dries.

What happens if it rains after the roof is sprayed?

We plan so that doesn't happen. On a warm day the treatment needs about an hour or two of dry weather to finish curing, and longer when it's cool. We only spray when the forecast gives it that window with room to spare. If rain looks likely, we pick another day.

Do you repair anything before spraying?

Yes. Every treatment includes a tune-up. Loose shingles, nail pops and worn flashing sealant get handled first. Bigger problems like soft decking or active leaks mean the roof isn't ready for treatment. You'll hear that at the assessment.

Keep reading

Find out if your roof can be saved before you pay for a new one.

A typical replacement around Asheboro runs $20,000 to $25,000 or more. Rejuvenation usually runs around 20% of that. The assessment tells you which one your roof needs.

  • The owner looks at your roof himself
  • A straight answer, even if the answer is no
  • Up to 5 more years per treatment
  • Done in an afternoon, no tear-off

Get an instant estimate

Book a free assessment

Takes 30 seconds. No pressure, no sales pitch.

Book a free roof assessment

Free and no obligation. Rather talk? Call (336) 523-0113.

Call nowFree assessment